太阳能热水器的控制部分的安装
来源:http://www.sdlntyn.com 发布时间:2016-12-22 15:46:48 浏览次数:520
1、将控制仪与控压盒及水位水温探头、环境温度探头连接好,接通电源,此时仪表开始自检,仪表显示当时所测得主机内部的温度,水位为空。仪表静止时上水、用水、加热灯均不亮。
1, the control instrument and pressure control box and water temperature probe, environmental temperature probe connected, turn on the power supply, the instrument began self-test, instrument display at that time measured the temperature inside the host, the water level is empty. Water, water and heating lamps are not bright when the instrument is still.
2、上水:先将室内水管用自来水冲洗片刻,以保证无杂物存畄为准。然后接控压盒和主机进水口,再按上水键上水,(集热器未上水前显示为空格,如无水就显示满水则需检查信号线或水位探头是否短路)。先对主机内部进行冲洗,待主机上部出热水口出水约2分钟左右,再将此接口与控制盒进热水口连接,打开热水龙头有水流出为止. 关闭热水龙头约4分钟后,泄压口会分时间段有少量水溢出,属正常现象。
2, water: first indoor water rinse with tap water for a moment, to ensure that no debris deposit Liu prevail. Then the pressure control box and then press the button to host the inlet, Sheung Shui Sheung Shui (collector before not Sheung Shui display spaces, such as water is full of water that you need to check whether the water level probe signal line or short circuit). First of the main internal flush to host upper hot water exit water for about 2 minutes, then the interface and control box into the hot water port, open the hot tap water out so far. The hot water faucet closed about 4 minutes later, the pressure relief port will be divided into time periods with a small amount of water overflow, belongs to the normal phenomenon.
3、手动电加热:按电加热键加热,如水不满则会先自动上水再自行加热属正常(如跳闸则检查是否电线接错或集热器是否有漏水现象);打开热水龙头则加热灯熄灭,属正常。
3, manual electric heating by electric heating heating key, such as water dissatisfaction will first automatic water supply to normal heating (such as tripping is to check whether the wires are wrong or collector; Water Leakage phenomenon) opened the hot water heating lamp is extinguished, is normal.
4、北京时间和电加热时间设置:按使用说明书操作。
4, Beijing time and electric heating time: according to the instructions.
5、完成检查:安装完成后对所有接口进行更后检查:有无漏水现象;对应的接头有无全部接好,测试控制系统功能是否齐全。
5, complete the inspection: after the completion of the installation of all interfaces for the final check: there is no leakage phenomenon; the corresponding joints are all connected, the test control system functions are complete.
本文来自:济南力诺瑞特太阳能更多的内容请点击:http://www.sdlntyn.com我们将会为您提问的问题提供一个满意的服务,欢迎您的来电!