在农村的一些地区,太阳能仍然有很多人在使用!太阳能热水器在购买回来之后需要找专业的人士进行安装,那么在安装过程中有哪些需要注意的事项呢?今天,小编就以济南力诺瑞特太阳能为例子,为大家讲一讲太阳能热水器的一些安装细节!
In some rural areas, solar energy is still used by many people! Solar water heaters need to be installed by professionals after they are purchased. What are the matters needing attention in the process of installation? Today, Xiaobian takes Jinan Linuorite solar energy as an example to tell you some installation details of solar water heater.
一、对于较高位置的太阳能热水器、顶端应考虑加装避雷针,防止雷击,造成事故。
First, lightning rods should be installed on the top of solar water heaters at higher locations to prevent lightning strikes and accidents.
二、成组安装时,应注意集热器的前后排距离,对于全年使用的太阳能热水器的家庭,可按集热器安装高度的3倍考虑;若以夏季为主,兼顾春秋使用,可取0.85倍集热器安装高度考虑。
2. When installing in groups, attention should be paid to the distance between front and rear rows of collectors. For families using solar water heaters all year round, the installation height of the collector can be considered three times as high as that of the solar water heater. If summer is dominant and spring and autumn are taken into account, 0.85 times of the installation height of the collector can be taken into account.
三、系统安装完毕后,通水调试,要求集热器、水箱、所有管路阀门无一渗漏,方可进行验收交付正式使用。

3. After the installation of the system, the water supply commissioning requires no leakage of the collector, water tank and all pipeline valves before acceptance and delivery for formal use.

济南力诺瑞特太阳能

四、为了把集热器基座与建筑主体结构连接牢固,一般采用预埋件加细石混凝土填捣密实的基座形式。钢基座及混凝土基座顶面的预埋件,在太阳能热水系统安装前要注意涂防腐材料。
4. In order to connect the collector base firmly with the main structure of the building, the compact base with embedded parts and fine stone concrete is usually adopted. Pre-embedded parts on the top of steel base and concrete base should be coated with anticorrosive materials before installation of solar hot water system.
五、框架的焊接要做到:同种框架尺寸一致、结构焊接牢固,焊缝整齐圆滑;油漆均匀美观。三角框架的摆放要首先在水平槽钢上做好割方后再确定框架的焊接位置,焊好的三角架要做到方、正。
Fifth, the welding of the frame should be done: the same frame size, solid structure welding, smooth welding seam, uniform and beautiful paint. The placement of the triangular frame should first be cut on the horizontal channel steel before determining the welding position of the frame. The welded triangular frame should be square and straight.
今天的精彩内容就暂且和大家介绍到这里了,如果大家还有其他想要了解的地方,欢迎大家到我们济南力诺瑞特太阳能的官网给我们留言评论:http://www.sdlntyn.com,或者直接拨打我们的咨询热线,我们将给您一个满意的答复!
Today's wonderful content will be introduced here for the time being. If you have other places you want to know, you are welcome to leave a message and comment on our official website of Jinan Linorate Solar Energy: http://www.sdlntyn.com, or call our hotline directly. We will give you a satisfactory answer!